Work Begins Widening Lake Harbour Drive

Eutaw begins work on a $10,246,865 project for the City of Ridgeland. Scope of work includes widening of Lake Harbour Drive from Hwy 51 to Northpark Drive.

Winston County, Mississippi – Highway 25

This project was the new construction of 12 miles of four lane highway. The project included 220 acres of clearing and grubbing, 2.6 million CY of earthwork, 3,500 CY of structural concrete, 2,300 linear feet of storm drain piping and 210,000 tons of asphalt pavement.

George and Greene Counties, Mississippi – Highway 63

This project consisted of road construction of approximately 13 miles of a new four lane road including the construction of six (6) new bridges. 800 acres of Clear and Grubb performed in 65 days, 9,000,000 cubic yards of Unclassified Excavation (Onsite), 24,000 linear feet of Storm Drainage, 15,000 cubic yards of Box Culvert Concrete

Pontotoc County, Mississippi – Highway 6

This project consisted of the construction of a new bridge including over 3.4 million CY of excavation to construct a new section of Highway 6. Lines of reinforced concrete pipe up to 60″ in diameter were installed. 600 acres of Clear and Grubb, 2,270,425 cubic yards (CY) of Unclassified Excavation (Onsite), 805,064 CY of Borrow Excavation (Contractor Furnished), 833,519 CY of Excess Excavation (Spoil), 14,305 linear feet of Storm Drainage