Caddo Parish, Louisiana – Interstate 49

This project included the movement of 2,513,150 CY of unclassified excavation (Onsite), 1,911,737 CY of embankment, 3,980 LF of storm drainage. It also involved the installation of approximately 2,000 LF of 84″ RCP at an average depth of 15′ and over 300′ of 7′ x 8′ precast box culvert at a depth of 12′. Eutaw performed 100% of this work with its own forces.