Ridgeland, Mississippi – Renaissance Retail Development Concrete Bridge and Weir Wall

This project included the construction of a reinforced concrete bridge and weir wall. The bridge work included 330 CY of concrete and 50,000 LBS of steel. The weir wall was constructed for a storm drainage detention pond that included 700 CY of concrete.