Osceola, Arkansas – Site Work for Big River Steel LLC

The first phase scope of work on the 1,200 acre consists of 1,200,000 cubic yards of earthwork.  Construction includes interior and access roads, railroads, building pads, drainage ditches, drainage piping and detention ponds.  Approximately 15 miles of roads and railroads were soil stabilized and capped with 6” of sub-ballast material.

The second phase scope consists of the foundation work for all of the plant’s buildings and equipment.  Eutaw is performing the excavation and embankment of approximately 550,000 cubic yards for all building footings and foundations at depths ranging from 5-45 feet.

Blue Springs, Mississippi – Rail Spur for Toyota

Construct a two mile railroad spur from the existing BNSF railroad to the Toyota Manufacturing Facility being constructed at Blue Springs, Mississippi. This project consists of the clearing and grubbing of 88 acres and the excavation of 822,000 cubic yards of unclassifed materials. The engineer for this project is Engineering Solutions, Inc.