KNOXVILLE, TENNESSEE – PHASE 2 AIRFIELD MODERNIZATION PROGRAM (RUNWAY RECONSTRUCTION) AT MCGEE TYSON AIRPORT

In September 2016 Eutaw Construction was awarded a $22.3 million contract for Phase 2 of Knoxville’s Airfield Modernization Program at the McGee Tyson Airport.   The contract duration is 14 months.

The contract requires rehabilitation of the existing runway to meet the FAA’s line-of-sight requirements.  These requirements are designed to make it easier for pilots to see the entire runway during takeoff and landings.  The runway had a “crown” that needed lowering that limited the line-of-sight.  Approximately 3,500 feet of the runway required demolition and then replaced.

Definable features of the project include:

  • Removing and stockpiling of 210,000 square yards of portland cement concrete (PCC)
  • 80,000 square yards of asphalt removal
  • 10,000 linear feet of storm sewer removal
  • Site demolition
  • 1,126,000 cubic yards of unclassified excavation
  • 17,000 linear feet of reinforced concrete storm drain pipe varying in size from 18” – 60”, including the installation of 33 drainage structures
  • 640 linear feet of 5’ x 12’ concrete box culvert
  • 3,000 linear feet  of 10” ductile iron pipe water main
  • 2,300 linear feet of 6” sanitary sewer force main, including lift station relocation
  • 162,000 square feet of articulating concrete block system for erosion control
  • 6,000 LF of encased duct bank

Eutaw Construction also performed Phase 1 of the Airport Runway Modernization which included a similar scope.  The contract amount for Phase 1 was $24.6 million.

SMYRNA, TENNESSEE – NISSAN ILC ROADWAY

Eutaw Construction was awarded the Nissan ILC Roadway contract from Nissan North America. This project involves the construction of a new access roadway and bridge needed to serve Nissan’s new ILC Facility. Since the project is located inside Nissan’s facility, the transportation of ± 30,000 cubic yards of embankment material is the biggest challenge. Eutaw’s scope of work includes clearing & grubbing, earthwork, storm drainage utilities, and the placement of aggregate base material. While other scopes of work, that will be completed by subcontractors, include the installation of a new 140 linear feet, triple-span concrete bridge, asphalt and concrete paving, striping, guardrails and a Foreign Trade Zone (FTZ) fence. Due to the site being inside a FTZ, careful consideration and planning is required for fence installation, work zones, and access.

COLUMBIA, TENNESSEE – SOUTHERN BLANKING EXPANSION PROJECT

Eutaw was awarded a contract to perform work on a 110,000 square foot expansion to the Southern Blanking manufacturing facility that will provide vehicle parts to the General Motors manufacturing plant in Spring Hill, Tennessee. The scope(s) includes 12,000 cubic yards of undercut excavation, 20,000 cubic yards of borrow excavation, revisions to the existing fire water system, installation of new sewer piping, and over 1,000 linear feet of storm and roof drain piping. The project also includes extending the existing parking lot and installing an at-grade rail crossing inside the facility.