Batesville, MS to Clarksdale, MS – Mississippi Department of Transportation Highway 6 Bridge Replacements

Eutaw Construction was awarded a $37.1 million contract to remove and dispose of the existing 11 bridge structures on Highway 6 between Batesville, MS and Clarksdale, MS. Construct detour roads and 11 new bridges. Also repair the Tallahatchie River Bridge and Relief Bridge. The project is a fast pace scheduled project with a construction time frame of 18 months.

 

Bookmark the permalink.