Smyrna, Tennessee – Topre America Stamping Facility (Nissan North America)

Eutaw’s scope of work consists of 70,000 cubic yards of excavation, including blasting and crushing excavated rock onsite to utilize for structural backfill of the building’s basement-level press pits and scrap metal conveyor system. This project also includes 9,000 square yards of heavy-duty concrete paving, 125 linear feet of concrete box culvert, and 3,000 linear feet of storm drainage piping. In addition to these major items, Eutaw is responsible for over 1,000 linear feet of sanitary sewer piping, and over 3,000 linear feet of fire and domestic water piping.