COLUMBIA, TENNESSEE – SOUTHERN BLANKING PROJECT

Eutaw performed site work on a 31-acre site for a 110,000 square foot manufacturing facility that will provide vehicle parts to the General Motors manufacturing plant in Spring Hill, TN.  Our scope(s) of work included approximately 20,000 cubic yards of onsite grading, 20,000 cubic yards of borrow excavation, drilling and blasting a 40-ft deep pit for future equipment, 2 bio-retention ponds, over 4,000 linear feet of domestic water, fire water, and sewer piping, and over 1,000 linear feet of storm and roof drain piping.  The project also includes relocating an adjacent rail car traffic line, and adding a point-of-switch along with approximately 2,500 linear feet of rail car access and storage for the building.