This $12 million project required the removal and replacement of six bridges on U.S. Highway 80 in Rankin County, MS. This was completed by the use of detour bridges and roads with the realignment of U.S. Highway 80. The project was segregated into 3 separate bridge sites. In addition the project included 786’ of miscellaneous drainage pipe & outfall structures, 280’ of box culvert construction, 355,000 CY of borrow material, 17,000 CY of unclassified excavation, and 20,600 CY of excess excavation. The bridge work bridge included 20,000 lf of steel piling, 330 lf of drilled concrete shafts, 8,200 lf of concrete bridge beams, and 2,800 CY of bridge concrete.