ALBANY, Georgia, WATER DISTRIBUTION FOR THE MARINE CORPS

Eutaw Construction teamed with Roy Anderson Corp on this design build project to provide design expertise, project management, quality control, safety coordination, GPS/GIS/Survey services, and pipe laying crews to install approximately 126,000LF of water pipe. 200 fire hydrants are being replaced or refurbished, over 600 gate valves are being installed, and over 200 buildings are being tied over to the new system.

The installation includes open cut pipe laying, jack and boring installation of steel casing, and HDD drills of HDPE pipe. The diameters range from 2” – 16” on the water mains, and up to 24” on the steel casing. The 126,000LF of water mains replace 95% of the existing water system on the Base.

 