Oxford, Mississippi – University-Oxford East Parallel Taxiway

This project included clearing and grubbing of approximately 55 acres for the taxiway and borrow excavation area, relocation of two structures (tower and electrical vault), the movement of 380,000 CY of select borrow material, 51,000 CY of unclassified excavation, 412 LF of reinforced concrete pipe (15″ and 24″), 240 LF of 23″ x 36″ of arched reinforced concrete pipe, 29,000 SY of 6″ cement treated base, 27,000 SY of 12″ PCC pavement.