Monroe County, Mississippi – Sipsey Trail

The project consists of widening one mile of Sipsey Trail Road in Monroe County, MS to include the replacement of 5 bridges and constructing a reinforced concrete box culvert. During construction of the bridges 8,310 LF of 14” concrete piling will be driven and over 966 CY of concrete will be poured. Construction of the roadbed will consist of moving roughly 85, 813 CY of borrow material and placing 10,091 TNS of crushed stone.

Bookmark the permalink.