Bay St. Louis, Mississippi – Utility Replacement

This project consists of the complete revitalization of the utility infrastructure that was damaged by Hurricane Katrina. This project required the replacement of 35,400 LF of sewer, 38,400 LF of water and 41,700 LF of gas line. All asphalt streets as well as concrete sidewalks and curb & gutter were removed and replaced. The aforementioned required being sensitive to the residents and local businesses during the holiday shopping season.