Shreveport, Louisiana – 60″ Water Main

This project required the installation of approximately 1 mile of 60″Ductile Iron pipe that is the final phase of the 60″Water Transmission Main projects that have been ongoing for more than two decades and ties-in to the Amiss Water Treatment Plant. The final phase traverses narrow city streets while encountering numerous major underground utilities and elevated railroad crossings. The tie-in required Eutaw’s team and its subcontractor’s to expedite their work in a well planned and strictly scheduled manner as the plant was shut down during the tie-in process.